Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Schemas start working only after they are connected to the fields.

  • Timer/Stopwatch scheme - Determines what configuration to consider the project and the type of task.

  • Timer/Stopwatch config - The configuration is responsible for the operation of the timer or stopwatch. When should he start the countdown, when should he stop, for what time should he start, according to what working calendar should the time be considered.

...